Awards

Hot In-Place Recycling

February 19, 2024

2 miles of road in the city of Littleton, Colorado. Cost of $850,000, 40% RAP, for a cost savings of over $500,00. Designer: City of Littleton. Contractor: Cutler Repaving

ARRA and Roads&Bridges Magazine

Presented by: 

2023 "Best in Colorado" Asphalt Pavement Awards; Category - Sustainability

February 6, 2024

City of Loveland 2023 Hot-In-Place Recycling Program 

Paving Contractor: Cutler Repaving of Windsor

Owner: City of Loveland


The City of Thornton's heater repaving project included edge milling followed by heater repaving (recycling the top 1" of existing asphalt and adding a 1.5" overlay of new asphalt.) This $270,000 paving operation was accomplished in a single pass, within a single lane closure. The project was completed in just 7 working days. 

City of Loveland

Presented by: 

Transportation – Medium Community/City of Littleton

October 24, 2023

County Line Road: Hot In-Place Recycling


This project had unique circumstances and innovative surface treatment. Cutler Repaving was able to provide a high-quality and long-lasting solution that was the "right choice on the right road at the right time." The City of Littleton found a new construction option that allowed them "more bang for the buck," and helps keep "good roads good." 

APWA

Presented by: 

2022 "Best in Colorado" Asphalt Pavement Awards; Category - "Urban In-Place Recycling"

February 7, 2023

The City of Thornton's heater repaving program included full width milling followed by heater repaving (recycling the top 1" of existing asphalt and adding an 1.5" overlay of new asphalt.) This $1.8M paving operation was accomplished in a single pass, within a single lane closure. The project was completed ahead of schedule in 47 of the 90 contract days.

Colorado Asphalt Pavement Association

Presented by: 

Project of the Year - Technical Innovation

June 7, 2022

Projects less than $5 Million


Hot In-Place Recycling

City of Greenville

APWA South Carolina

Presented by: 

2020 "Best in Colorado" Asphalt Pavement Awards; Category - "Urban In-Place Recycling"

February 25, 2021

The City of Thornton's heater repaving program included edge milling followed by heater repaving (recycling the top 1" of existing asphalt and adding an 1.25" overlay of new asphalt.) This $1.3M paving operation was accomplished in a single pass, within a single lave closure. The project was completed ahead of schedule in 28 of the 38 contract days. 

Colorado Asphalt Pavement Association

Presented by: 

2017 ARRA/Roads & Bridges Asphalt Recycling Award; Category: Hot In-place Recycling

March 15, 2017

Project Name: SR-199

Length: 84 lane-miles

Cost: $11 million

%RAP used: 70%

Cost Savings: $4.05 million

Designer: UDOT Region 2

Owner: Utah DOT

Contractors: Granite Construction, Cutler Repaving

Roads & Bridges

Presented by: 

2013 Roads & Bridges/Asphalt Recycling and Reclaiming Association Recycling Award

February 8, 2013

Arizona would sound like the perfect place to do a hot in-place recycling of asphalt rubber such as the one undertaken along 99th Avenue in Sun City, Ariz., last spring.

Roads & Bridges

Presented by: 

ARRA Logo.png
apwa colorado.png
apwa south carolina.png
arra_rb_recycleawards_2024_c.png
Colorado Asphalt Pavement Association logo.png
Colorado Asphalt Pavement Association logo.png
Colorado Asphalt Pavement Association logo.png
Screenshot 2024-07-20 at 6.32.55 PM.png
bottom of page