Awards
Hot In-Place Recycling
February 19, 2024
2 miles of road in the city of Littleton, Colorado. Cost of $850,000, 40% RAP, for a cost savings of over $500,00. Designer: City of Littleton. Contractor: Cutler Repaving
ARRA and Roads&Bridges Magazine
Presented by:
2023 "Best in Colorado" Asphalt Pavement Awards; Category - Sustainability
February 6, 2024
City of Loveland 2023 Hot-In-Place Recycling Program
Paving Contractor: Cutler Repaving of Windsor
Owner: City of Loveland
The City of Thornton's heater repaving project included edge milling followed by heater repaving (recycling the top 1" of existing asphalt and adding a 1.5" overlay of new asphalt.) This $270,000 paving operation was accomplished in a single pass, within a single lane closure. The project was completed in just 7 working days.
City of Loveland
Presented by:
Transportation – Medium Community/City of Littleton
October 24, 2023
County Line Road: Hot In-Place Recycling
This project had unique circumstances and innovative surface treatment. Cutler Repaving was able to provide a high-quality and long-lasting solution that was the "right choice on the right road at the right time." The City of Littleton found a new construction option that allowed them "more bang for the buck," and helps keep "good roads good."
APWA
Presented by:
2022 "Best in Colorado" Asphalt Pavement Awards; Category - "Urban In-Place Recycling"
February 7, 2023
The City of Thornton's heater repaving program included full width milling followed by heater repaving (recycling the top 1" of existing asphalt and adding an 1.5" overlay of new asphalt.) This $1.8M paving operation was accomplished in a single pass, within a single lane closure. The project was completed ahead of schedule in 47 of the 90 contract days.
Colorado Asphalt Pavement Association
Presented by:
Project of the Year - Technical Innovation
June 7, 2022
Projects less than $5 Million
Hot In-Place Recycling
City of Greenville
APWA South Carolina
Presented by:
2020 "Best in Colorado" Asphalt Pavement Awards; Category - "Urban In-Place Recycling"
February 25, 2021
The City of Thornton's heater repaving program included edge milling followed by heater repaving (recycling the top 1" of existing asphalt and adding an 1.25" overlay of new asphalt.) This $1.3M paving operation was accomplished in a single pass, within a single lave closure. The project was completed ahead of schedule in 28 of the 38 contract days.
Colorado Asphalt Pavement Association
Presented by:
2017 ARRA/Roads & Bridges Asphalt Recycling Award; Category: Hot In-place Recycling
March 15, 2017
Project Name: SR-199
Length: 84 lane-miles
Cost: $11 million
%RAP used: 70%
Cost Savings: $4.05 million
Designer: UDOT Region 2
Owner: Utah DOT
Contractors: Granite Construction, Cutler Repaving
Roads & Bridges
Presented by:
2013 Roads & Bridges/Asphalt Recycling and Reclaiming Association Recycling Award
February 8, 2013
Arizona would sound like the perfect place to do a hot in-place recycling of asphalt rubber such as the one undertaken along 99th Avenue in Sun City, Ariz., last spring.
Roads & Bridges
Presented by: